俄罗斯阿穆尔气体处理站项目


2019-04-15
+ 产品简介 +
为了校核俄罗斯阿穆尔气体处理站项目舱体结构设计的合理性,采用有限元仿真的方法,建立舱体的3维有限元仿真模型,进行静止平放状态下舱体承力框架、地脚螺栓的强度及计算分析;进一步的,分析舱体吊装状态下的舱体、起吊点和吊具强度。通过有限元仿真数据的处理,对关键结构件的强度及变形进行分析,最后给出变形及强度校核结果。
3D finite element simulation model is built by the method of finite element simulation to calculate and analyze the strength of cabin bearing frames and anchor bolts in static placement, thus verifying the reasonability of the cabin structure design in the Russia Amur Gas Treatment Station Project, to further analyze the strength of the cabin, hoisting points and hoisting tools in hoisting state. The strength and deformation of key structural components are analyzed by processing finite element simulation data to finally present deformation and strength verification results.
舱体总体尺寸:15m(总长)×4.5 m(宽)×10.5m(总高),其中一层高2.8m、二层高3.5m(含坡顶3.75m)、三层高3.32m(含坡顶3.75m)。
Overall dimension of cabin: 15m (overall length) ×4.5m (width) ×10.5m (overall height), wherein the first layer is 2.8m high, the second layer 3.5m high (3.75m including slope top) and the third layer 3.32m (3.75m including slope top).
+ 更多详情 +

为了校核俄罗斯阿穆尔气体处理站项目舱体结构设计的合理性,采用有限元仿真的方法,建立舱体的3维有限元仿真模型,进行静止平放状态下舱体承力框架、地脚螺栓的强度及计算分析;进一步的,分析舱体吊装状态下的舱体、起吊点和吊具强度。通过有限元仿真数据的处理,对关键结构件的强度及变形进行分析,最后给出变形及强度校核结果。 

3D finite element simulation model is built by the method of finite element simulation to calculate and analyze the strength of cabin bearing frames and anchor bolts in static placement, thus verifying the reasonability of the cabin structure design in the Russia Amur Gas Treatment Station Project, to further analyze the strength of the cabin, hoisting points and hoisting tools in hoisting state. The strength and deformation of key structural components are analyzed by processing finite element simulation data to finally present deformation and strength verification results.  

舱体总体尺寸:15m(总长)×4.5 m(宽)×10.5m(总高),其中一层高2.8m、二层高3.5m(含坡顶3.75m)、三层高3.32m(含坡顶3.75m)。 

Overall dimension of cabin: 15m (overall length) ×4.5m (width) ×10.5m (overall height), wherein the first layer is 2.8m high, the second layer 3.5m high (3.75m including slope top) and the third layer 3.32m (3.75m including slope top).


1.综述 

1. General  

为了校核俄罗斯阿穆尔气体处理站项目舱体结构设计的合理性,采用有限元仿真的方法,建立舱体的3维有限元仿真模型,进行静止平放状态下舱体承力框架、地脚螺栓的强度及计算分析;进一步的,分析舱体吊装状态下的舱体、起吊点和吊具强度。通过有限元仿真数据的处理,对关键结构件的强度及变形进行分析,最后给出变形及强度校核结果。

3D finite element simulation model is built by the method of finite element simulation to calculate and analyze the strength of cabin bearing frames and anchor bolts in static placement, thus verifying the reasonability of the cabin structure design in the Russia Amur Gas Treatment Station Project, to further analyze the strength of the cabin, hoisting points and hoisting tools in hoisting state. The strength and deformation of key structural components are analyzed by processing finite element simulation data to finally present deformation and strength verification results.

舱体总体尺寸:15m(总长)×4.5 m(宽)×10.5m(总高),其中一层高2.8m、二层高3.5m(含坡顶3.75m)、三层高3.32m(含坡顶3.75m)。

Overall dimension of cabin: 15m (overall length) ×4.5m (width) ×10.5m (overall height), wherein the first layer is 2.8m high, the second layer 3.5m high (3.75m including slope top) and the third layer 3.32m (3.75m including slope top).

结构强度分析报告考虑的载荷类型包括:

Load types considered in the structure strength analysis report include:

1.恒载荷

1. Dead load

2.内部设备重量载荷;

2. Weight load of internal equipment;

3.活载荷;

3. Live load;

4.雪载荷;

4. Snow load;

5.风载荷;

5. Wind load;

6.温度载荷;

6. Temperature load;

7.地震载荷。

7. Seismic load.

强度分析时,根据设计规范,考虑恒载荷、临时载荷(内部设备载荷、活载荷、雪载荷、风载荷、温度载荷)和特殊载荷(地震载荷)组成的特殊载荷组合

Consideration is given to special load combination composed of dead load, temporary load (internal equipment load, live load, snow load, wind load, temperature load) and special loads (seismic load) according to design specifications during strength analysis.


2.结构设计标准 

2. Structural Design Criteria  

采用的相关标准和规范如下:

Relevant applied standards and codes are as follows:

1)建筑规范-23-81*-钢结构;

(1) Construction code -23-81*- steel structure:

2)建筑规范2.01.07-85*-载荷和作用;

(2) Construction code 2.01.07-85*- load and function;

3)客户给定的技术文件。

(3) Technical documents provided by customers.

 

 

 

 

 

 

 